Skidding, jacking up and dry mating of Shell Malikai TLP topside over its hull

Thảo luận trong 'Tension Leg Platform, Buoy – Type Platform' bắt đầu bởi Long Le Dinh, 19/10/15.

  1. Long Le Dinh

    Long Le Dinh Guest

    Video of ground skidding (by push jacks), jacking up by ALE mega jack system and overhead skidding/dry mating of Shell Malikai TLP topside over its hull at MMHE yard, Johor Bahru, Malaysia.

    https://www.youtube.com/watch?v=J94-o3BIDFI&feature=youtu.be

    The Shell Malikai Tension Leg Platform project at a glance:

    - Dry tree tension leg platform, 1st TLP ever built in Malaysia offshore Sarawak. Water depth at the installation location is 500 meters.
    - Processing capacity of 60,000bpd and 1.4 million cubic metres per day of gas.
    - Total dry weight hull & topside is appx. 30.000mT.
    - Anchored to seafloor by 08 tendons, 02 at each column.
    - Design and fabrication: Technip & MMHE joint venture.
    - Topside jack up, integration and loadout: ALE
    - Nearshore transport and float off: Dockwise White Marlin.
    - Transport and installation: Heerema Marine Contractors (HMC). The installation is scheduled in March, 2016.
    - Installation vessel: DCV Aegir.
     
    Last edited by a moderator: 20/10/15
  2. khanh123

    khanh123 Member

    Tham gia ngày:
    22/8/12
    Bài viết:
    32
    Đã được thích:
    0
    Điểm thành tích:
    6
    đã xem qua cái clip này trên một post bên LinkedIn thật sư hồi hộp và khâm phục, chi tiết, tỉ mỉ và cực kỳ chính xác.
     

Chia sẻ trang này